PM571 Week 4 Project Change Control Discussion Paper

Assignment Content

Top of Form

Address the following questions in a 350- to 700-word paper:

    • How are the work breakdown structure (WBS) and the change control plan connected?
    • What are the likely project outcomes if a change control process is not used? Why?

Format your paper consistent with APA guidelines.

 

  

No comments:

Post a Comment